Documentation Index
Fetch the complete documentation index at: https://docs.tread.ai/llms.txt
Use this file to discover all available pages before exploring further.
What it is
A Material is whatever the truck hauls — sand, stone, asphalt, dirt, mulch. Each Material is a record with a name, code, UoM, and rate. Most customers pull the master list from their accounting system so codes match invoices.Why it matters
Materials drive the line items on every invoice and the cost codes on every export. Wrong code, wrong invoice. They also carry the Prevailing Wage (PW) flag — the field that decides whether a load gets paid at PW rates on a public-works job.How Tread models it
- Material — name, code, UoM (tons, cubic yards, loads), default rate.
- Source — typically imported from QuickBooks, Sage, Vista, Foundation, or Spectrum so codes match the books.
- Prevailing Wage flag — per Material. Independent of any project setting.
- Material Rates — can be set per Customer, per Site, or globally. See Rates, Add-Ons & Fuel.
| Field | Required | Notes |
|---|---|---|
| Name | Yes | What dispatchers and drivers see |
| Code | Yes | Must match accounting export |
| UoM | Yes | Drives how loads are counted |
| Prevailing Wage flag | No | Set per material, not per project |
Common pitfalls
Related
- Rates, Add-Ons & Fuel — how Material rates are priced
- Prevailing Wage — full PW workflow
- Onboarding: Materials — step-by-step setup